The Natural Gas Authority in the Energy Ministry announced the completion of the offshore gas pipeline connecting Ashdod to Ashkelon, with gas flow now underway. The project was valued at approximately NIS 1 billion, according to a report by Lior Bakalo (N12).
The Natural Gas Authority in Israel's Ministry of Energy announced the completion of the offshore natural gas pipeline between Ashdod and Ashkelon, with gas flow now starting in the new segment. The project, which cost approximately NIS 1 billion ($270 million), was reported by Lior Bakalo (N12).
This is the first The Zioneer bulletin on this specific infrastructure project; no prior coverage was found in the archive. The pipeline strengthens Israel's national energy grid and supports gas transport along the southern coast.
- StrongEnergy Minister Eli Cohen says Lebanon gas deal prompts new Israeli exploration effort
- DevelopingFour suspects arrested for smuggling cigarettes worth NIS 20 million at Ashdod port
- DevelopingHeavy fire incident reported in Ashdod
- DevelopingTransport Ministry chief: NIS billions invested in railway from Kiryat Shmona to Eilat
Source and signal
- Internal intake